STATUS OF MOU/IA TERMINATED PROJECTS

 

EXPORT TO EXCEL

Name of ProjectLocationImplementing AgencyCapacity In MWRemarks
Teesta Stage-IINorth SikkimHim Urja Infra Pvt. Ltd330Project survey & investigation works could not be undertaken due to opposition from Lachen Dzumsa. The project was revised & approved for implementation under Chungthang GP area only whereby the capacity was reduced to 150 MW. The LoI for the revised capacity had been issued on 17.09.2012. However due to non performence of the developer the project has been withdrawn from Him urja Infra Pvt. Ltd. and termination letter issued on 20.09.2016.
Sada-Mangder HEPWest/South SikkimGati Infrastructures Ltd71MoU/IA terminated due to non achievement of the stipulated milestones by the developer on 20.02.2017
Suntaleytar HEPEast Sikkim Moser Baer Electric Power Ltd / Shreya Powertech Pvt Limited40DPR prepared and completed by CWC and submitted to the Energy & Power Deptt. Due to non performance of the developer the LoI has been terminated on 20/2/2017.
Kalez Khola- I HEPWest SikkimCosmic Infra Powergen Pvt Ltd27.5MoU/IA terminated due to non performance of the developer on 24.09.2016
Kalez Khola-II HEPWest SikkimPentacle Power Pvt Ltd54MoU/IA terminated due to non performance of the developer on 20.02.2017
Manul and ManganNorth SikkimHigen30MoU/IA terminated due to non performance of the developer on 20.09.2017
Upper Rolep (Nathangchu) HEPEast SikkimCosmic Infrapowergen Pvt Limited30MoU/IA terminated due to non performance of the developer on 24.09.2016
Upper Rolep (Tshanguchu) HEPEast SikkimCosmic Infrapowergen Pvt Limited30MoU/IA terminated due to non performance of the developer on 24.09.2016
TingTing HEPWest SikkimT.T. Energy Pvt. Ltd.99Project cancelled vide Govt. Notification No. 12/Home/2012 as milestones as per MOU not achieved.
Lethang HEPWest SikkimKHC Lethang Hydro Project Pvt. Ltd.96Project not granted clearance by National Wild Life Board, Gol. Project cancelled vide Notification No. 12/Home/2012.
Teesta Stage-I HEP, Zema, LachenNorth SikkimHimalayan Green Energy Pvt. Ltd.280MOU/IA cancelled as these area fell within the vicinity of Kanchanjonga National Park.
Lingza HEPNorth Sikkim120Projects cancelled/not taken up as these area fell within Dzongu area and in the vicinity of Kanchanjonga National Park.
Rangyong HEPNorth Sikkim80Projects cancelled/not taken up as these area fell within Dzongu area and in the vicinity of Kanchanjonga National Park.
Rukel HEPNorth Sikkim33Projects cancelled/not taken up as these area fell within Dzongu area and in the vicinity of Kanchanjonga National Park.
Rathangchu HEPWest SikkimState Govt.30Projects scraped due to Religious sentiments.
Ringpi HEPNorth Sikkim320Projects cancelled/not taken up as these area fell within Dzongu area and in the vicinity of Kanchanjonga National Park.
Rechu-MeyongchuNorth SikkimPlanet Infra Projects Pvt. Ltd.26MOU/IA terminated due to non performance of the developer.